<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/"><channel><title>SteelStud.ca field notes</title><link>https://www.steelstud.ca/blog</link><description>Credited framing, wall and ceiling project field notes.</description><item><title>Vestibule openings: review the frame before boarding</title><link>https://www.steelstud.ca/blog/vestibule-opening-review-rambo-burnaby</link><guid isPermaLink="true">https://www.steelstud.ca/blog/vestibule-opening-review-rambo-burnaby</guid><description>Two credited Rambo archive views from Burnaby General Hospital organise the review of an opening, its overhead frame and the next trade’s scope.</description><dc:date>2026-11-02</dc:date></item><item><title>Demising walls and ceilings: read the interfaces before close-in</title><link>https://www.steelstud.ca/blog/commercial-demising-walls-ceiling-interfaces</link><guid isPermaLink="true">https://www.steelstud.ca/blog/commercial-demising-walls-ceiling-interfaces</guid><description>Credited Rambo project photographs support a review of wall lines, ceiling edges and installation handoffs.</description><dc:date>2026-10-27</dc:date></item><item><title>Commercial bulkheads and ceiling grids: coordinate before close-in</title><link>https://www.steelstud.ca/blog/commercial-bulkheads-grid-overhead-coordination</link><guid isPermaLink="true">https://www.steelstud.ca/blog/commercial-bulkheads-grid-overhead-coordination</guid><description>Construction-stage photographs connect framing lines, ceiling levels and overhead services.</description><dc:date>2026-10-21</dc:date></item></channel></rss>